Dominion Energy 2026 Q3 Earnings Call
Review the key takeaways and the transcript of this earnings call.
- Third-quarter operating earnings were $1.28 per share, including 5 cents from R&G 45Z credits and 5 cents from Better Than Normal Weather; third-quarter GAAP results were $1.30 per share.
- LTM Weather Normal Electric sales growth was 3.4% across DEV and DESC, and DESC set a new all-time electric peak in August.
- Dominion Energy had over 54 gigawatts of data center capacity in various stages of contracting, including over 12 gigawatts contracted under electric service agreements, and had added over 6 gigawatts of contracts, or 13%, since the end of last year.
- Seavow was approximately 85% complete, with fabrication of all nacelles, towers, and blades complete and 44 turbines installed, representing more than 640 megawatts of generating capacity.
- Seavow's current budget remained $11.65 billion, including $123 million of unused contingency; its LCOE remained well below the statutory threshold and the range contemplated in the original filing.
- The Virginia State Corporation Commission approved Dominion Energy's fuel securitization financing petition, representing a balance of approximately $900 million, in September.
STOCKNOW INSIGHTS
Continue with outlook and guidance.
Log in to unlock executive comments and Q&A highlights.
Log in for the full summaryStockNow uses AI to translate and summarize earnings calls. Accuracy and completeness are not guaranteed.
Transcript
Preview the first fifteen paragraphs, organized by speaker.
Welcome to the Dominion Energy Third Quarter 2026 Earnings Conference Call. At this time, each of your lines is in a listen-only mode. At the conclusion of today's presentation, we will open the floor for questions. Instructions will be given for the procedure to follow if you would like to ask a question. I would now like to turn the call over to David McFarland, Senior Vice President, Investor Relations and Treasurer.
Good morning, and thank you for joining Dominion Energy's Third Quarter 2026 Earnings Call. Earnings materials, including today's prepared remarks, contain forward-looking statements and estimates that are subject to various risks and uncertainties. Please refer to our SEC filings, including our most recent annual report on Form 10-K and our quarterly reports on Form 10-Q, for a discussion of factors that may cause results to differ from management's estimates and expectations. This morning, we will discuss some measures of our company's performance that differ from those recognized by GAAP. Reconciliation of our non-GAAP measures to the most directly comparable GAAP financial measures, which we can calculate, are contained in the earnings release kit. I encourage you to visit our investor relations website to review webcast slides, as well as the earnings release kit.
Joining today's call are Bob Blue, Chair, President, and Chief Executive Officer, Steven Ridge, Executive Vice President and Chief Financial Officer, and other members of senior management. I will now turn the call over to Steven.
Thank you, David, and good morning, everyone. We continue to be focused on three top priorities. First, consistent achievement of our financial commitments. Second, continued achievement of major construction milestones for the Coastal Virginia Offshore Wind Project. Third, constructive achievement of regulatory outcomes that demonstrate our ability to work cooperatively with regulators and stakeholders to benefit both customers and shareholders. As we will discuss today, we continue to demonstrate success against these priorities, extending our track record of high-quality and consistent execution. I will cover financial results in my remarks. Bob will provide updates on the NextEra Energy combination, CVOW, and other business items in his remarks. Turning first to third quarter results, as shown on slide 3. Third quarter operating earnings were $1.28 per share, including $0.05 from RNG 45Z credits and $0.05 from better-than-normal weather. Third quarter GAAP results were $1.30 per share.
A summary of earnings drivers relative to the prior year period is included in Schedule 4 of the earnings release kit, and a summary of all adjustments between operating and GAAP results is included in Schedule 2 of the earnings release kit. Turning now to guidance. Year-to-date operating EPS has benefited from better-than-budgeted sales, better-than-normal weather, and higher-than-expected 45Z credit income, combined with strong overall financial and operational execution. Inclusive of conservatism for balance-of-year weather, as well as potential opportunities to de-risk future financial performance, we now expect full-year results to be in the top half of our original guidance range. We have provided year-over-year drivers for the fourth quarter in the appendix of today's materials for your reference. Additionally, we are reaffirming all other existing financial guidance provided on our fourth quarter earnings call, including credit, dividend, and long-term growth guidance. Turning to financing on slide four.
We made significant progress on our financing plan during the quarter, successfully executing several planned transactions while continuing to manage the balance sheet consistent with our robust credit guidance. In September, the Virginia State Corporation Commission approved our fuel securitization financing petition, representing a balance of approximately $900 million, helping mitigate near-term fuel-related impacts on customer bills. Turning briefly to sales. We are continuing to see strong sales in our service areas, with LTM weather-normal electric sales growth of 3.4% across DEV and DESC. In addition, all 10 of the DOM Zone's summer peak demand days have occurred in 2026, and in August, DESC set a new all-time electric peak. Turning to slide five. Since our last update, we continue to see robust and durable demand from our differentiated, high-quality, low-risk data center customers across multiple localities in Virginia, and we are bringing these customers onto our system in the right way, protecting existing customers from cost shifts while mitigating stranded cost risk by utilizing a large load framework approved by the Virginia State Corporation Commission in our most recent biennial review that ensures these customers continue to pay their fair share of the investments required to support their growth.
We now have over 54 gigawatts of data center capacity in various stages of contracting, including over 12 gigawatts of capacity contracted under electric service agreements. To put that in context, we have added over six gigawatts of contracts, or 13%, since the end of last year. In conclusion, I am highly confident in our ability to deliver on our financial plan.
We have built our plan to be appropriately, but also not unreasonably, conservative to weather unforeseen challenges that may occur. With that, I will turn the call over to Bob.
Thank you, Steven. I will begin with safety on slide 6. Through September, our employee OSHA injury recordable rate was 0.41, which remains well below industry average. Safety is our first core value, and we are always focused on driving workplace injuries to zero. Turning next to our announced combination with NextEra Energy. As we detailed in May, this transaction represents a truly transformational opportunity to bring together two world-class utilities with 238 years of collective industry experience to even better serve millions of regulated customers across four states. Looking ahead, we believe we can accomplish far more on behalf of our customers together than we can apart. In mid-September, NextEra and Dominion announced an enhanced Virginia benefits package that puts customers first and positions the Commonwealth as a global energy leader.
That proposal doubled the duration of residential bill credits, expanded energy bill assistance by $100 million, included a $100 million workforce development fund, committed to creating at least 1,000 new jobs in the Commonwealth, building a new shareholder-funded co-headquarters tower in Richmond, and supporting Virginia companies through a $1 billion annual five-year Virginia Supplier Program. Over the longer term, customers and communities will benefit from a stronger company with the scale and capabilities to buy, build, finance, and operate critical energy infrastructure more efficiently, helping support reliability, affordability, and economic growth. In Virginia, we have received testimony from parties which we will address through rebuttal testimony due November 2nd. Evidentiary hearings begin on November 17th, and a final order is due by January 11th of next year.
Ultimately, the State Corporation Commission will decide the case based on the record presented to it and on the legal standard, whether adequate service to the public at just and reasonable rates will not be impaired or jeopardized by the proposed transaction. Another way of thinking about this is whether the transaction will do no harm to customers. We are confident that we have met that standard. In fact, we have exceeded the standard by proposing significant benefits in terms of customer affordability, jobs in our service area, and development of needed energy resources. In South Carolina, we have received testimony from parties which we will address through rebuttal testimony due November 18th. Hearings begin on December 8th, with a final order by January 29th, 2027. In North Carolina, hearings begin on February 23rd, 2027. The timelines for each of the proceedings are shown on slide 7.
Required federal approvals have all been filed and continue to progress. We continue to expect the transaction to close in the second half of 2027. I could not be more excited about the combination of these two companies. We will continue to share updates as we progress through the regulatory process. Turning next to offshore wind on slide 8. CVOW continues to make significant progress, with the project approximately 85% complete and the fabrication of all nacelles, towers, and blades now complete. We have installed 44 turbines, representing more than 640 megawatts of generating capacity, with the installation of the 45th turbine happening now. Installation continues to average approximately two days from jack-up to jack-down, consistent with our assumptions. July and August turbine installation cadence was in line with expectations, while September and October were below due to a combination of weather and Charybdis maintenance activities, which were completed earlier this month.
Importantly, these impacts were within the types of risks contemplated when we added schedule contingency last quarter. While we've utilized a portion of that contingency, our outlook has not changed. We continue to expect project completion by the end of 2027 and energization of the third and final offshore substation by year-end 2026. From a cost perspective, our current budget remains $11.65 billion, including $123 million of unused contingency. We also continue to see strong customer value. The project's LCOE remains well below the statutory threshold, as well as the range contemplated in our original filing, and we estimate CVOW will generate approximately $5 billion of fuel savings for customers during its first 10 years of operation. Our overall view of the project remains unchanged.
CVOW installation has been significantly de-risked and continues to make progress against its schedule and cost objectives while delivering significant long-term customer value. Now I'll turn to other business updates as shown on slide 10. In mid-October, we filed our Virginia Integrated Resource Plan update, which included several possible generation build portfolios designed to meet robust customer demand growth. Relative to last year's company preferred plan, we've added and accelerated 4 GW of solar and 2 GW of battery storage. Importantly, under the company's preferred plan, we're meeting our customer needs, protecting system reliability, maintaining affordability with monthly residential electric bills forecasted to increase on average by about 2.3% annually. We continue to see a growing role for energy storage in Virginia. Our recently filed IRP is an update and represents a snapshot in time, but it already reflects a meaningful increase in storage relative to our prior plan.
Importantly, Virginia also enacted significant energy storage legislation this year that establishes substantially higher targets for both short and long duration storage. We expect storage to play an increasingly important role as use cases continue to broaden and the technology continues to advance. We're actively evaluating both short-duration battery storage and emerging long-duration technologies through the lens of reliability, affordability, and customer need. Looking longer term, the proposed combination with NextEra Energy would bring together significant capabilities and experience in energy storage. We believe that positions the combined company exceptionally well to deploy storage at scale as the technology matures and system needs evolve. Finally, on Millstone, in September, the Connecticut Department of Energy and Environmental Protection provided an update on the zero-carbon energy request for proposals, indicating that it intends to announce a decision later this year.
FULL TRANSCRIPT
Continue the full translated transcript in StockNow.
Log in to unlock every statement, the English original, and speaker-by-speaker history.
Log in for the full transcriptCall participants
10 people spoke on this call — only 2 are shown here.