- In August, Lightbridge was selected for the Nuclear Energy Launch Pad INL program, administered by the U.S. Department of Energy's National Research Innovation Center at Idaho National Laboratory, providing an accelerated pathway toward DOE authorization to design, build, and operate the Lightbridge Fuel Pilot Facility, informally called SHED.
- As of September 30, 2026, Lightbridge had not entered into any material binding commitments for construction of the pilot factory, and its construction and operation remain subject to additional DOE and INL agreements, reviews, authorizations, and other prerequisites.
- In August, Lightbridge entered into project task statement number 2 under its cooperative research and development agreement with Battelle Energy Alliance, providing access to the Advanced Test Reactor loop facility for irradiation testing of enriched uranium and zirconium fuel rodlets with cladding in cylindrical and multi-lobe geometry.
- Post-irradiation examination has begun on the first batch of fuel material samples removed from the ATR in May, to collect data on material properties at various burn-up levels for validating and verifying fuel performance models and supporting licensing work.
- In September, Lightbridge received notice of allowance from the Japan Patent Office for a patent covering its multi-zone fuel element and 3D printing method.
- As of September 30, 2026, Lightbridge held approximately 236.7 million dollars in cash and cash equivalents, compared with approximately 201.9 million dollars at December 31, 2025, and had no debt.
- For the first nine months of 2026, Lightbridge used approximately 13.2 million of cash in operating activities, compared with 8.1 million for the same period last year.
- During the nine months ended September 30, 2026, Lightbridge sold 4.3 million shares under its ATM sales agreement with Jefferies for aggregate net proceeds of 48.9 million; approximately 4.5 million of net proceeds were raised during the third quarter, and approximately 91.4 million remained available under its 150 million dollar ATM program as of September 30, 2026.
- Net loss was 20.4 million dollars, or 62 cents per share, for the first nine months of 2026, compared with 12.4 million dollars, or 55 cents per share, for the first nine months of 2025.
- Total operating expenses for the nine months ended September 30, 2026 were 25.6 million dollars, compared with 14.5 million dollars for the same period in 2025; R&D expenses were 12.6 million dollars versus 5.3 million dollars, and G&A expenses were 13 million dollars versus 9.2 million dollars.
- Total other income for the nine months ended September 30, 2026 was 5.2 million dollars, compared with 2.1 million dollars for the same period in 2025, and consisted of interest income from Treasury bills and the company's bank savings account.
STOCKNOW INSIGHTS
Continue with outlook and guidance.
Log in to unlock executive comments and Q&A highlights.
Log in for the full summaryStockNow uses AI to translate and summarize earnings calls. Accuracy and completeness are not guaranteed.
Transcript
Preview the first fifteen paragraphs, organized by speaker.
Thank you for standing by, and welcome to the Lightbridge Corporation Business Update and Third Quarter 2026 Conference Call. Please note that today's call is being recorded. It is now my pleasure to introduce Matthew Abenante, Senior Director of Investor Relations and Capital Markets for Lightbridge Corporation.
Thank you, operator, and thank you all for joining us today. Our earnings press release was distributed this morning before the market opened, and it's available on the Investor Relations page of the Lightbridge website at www.ltbridge.com. Joining us on the call today is Seth Grae, Chairman and Chief Executive Officer, along with Andrey Mushakov, Executive Vice President and Chief Operating Officer, Scott Holcombe, Senior Vice President and Chief Technology Officer, Larry Goldman, Chief Financial Officer, and Lesli Mills, Controller. I want to remind our listeners that any statements on this call that are not historical facts are forward-looking statements. Today's discussion includes forward-looking statements about the company's competitive position and product and service offerings. During today's call, words such as expect, anticipate, believe, and intend will be used in our discussion of future goals and events.
This discussion is based on current expectations and involves certain risks and uncertainties that may cause actual results to differ significantly from such estimates. These and other risks are set forth in more detail in Lightbridge's filings with the Securities and Exchange Commission. Lightbridge does not assume any obligation to update or revise any such forward-looking statements, whether as a result of new developments or otherwise. With that, I would like to turn the call over to our first speaker, Seth Grae, Chief Executive Officer of Lightbridge.
Hello, Seth. Hello, Matt, and thank you all for joining us to discuss Lightbridge's third quarter 2026 business update.
The third quarter brought what we believe is the most significant advance to date in Lightbridge's path from fuel testing to commercial development. In August, Lightbridge was selected to participate in the Nuclear Energy Launch Pad INL program, administered by the U.S. Department of Energy's National Reactor Innovation Center at Idaho National Laboratory. Selection provides an accelerated pathway toward DOE authorization for us to design, build, and operate a pilot facility at INL to manufacture lead test assemblies of Lightbridge Fuel for demonstration in U.S. commercial power reactors. We now call that facility the Lightbridge Fuel Pilot Factory, which we informally refer to as SHED. By establishing a dedicated manufacturing facility under DOE authorization, we expect to shorten the timeline for producing lead test assemblies for operation in commercial U.S. reactors.
That gives us a two-pronged approach. The pilot factory is designed to produce lead test assemblies under DOE authorization while we continue to develop a conceptual design for our future commercial-scale plant, the Lightbridge Fuel Factory, formerly referred to as the Lightbridge Expandable Fuel Facility. The Lightbridge Fuel Factory will still be expandable, even though it doesn't have that word in its name. Alongside that milestone, we advanced in other key areas during the quarter. in August, we entered into a new project task statement with Idaho National Laboratory that gives us access to the loop facility of the Advanced Test Reactor, where we will irradiate clad Lightbridge Fuel rodlets under the conditions a fuel rod would experience in a commercial light water reactor. In September, we received notice of an allowance of a patent from the Japan Patent Office covering our multi-zone fuel element and 3D printing method.
I will now turn the call over to Andrey Mushakov, Executive Vice President and Chief Operating Officer, to walk through our fuel development program highlights in detail.
Andrey? Thank you, Seth. As Seth mentioned, our focus since the Launch Pad selection has been on preparing the pilot factory.
We're currently working with NRIC and INL to negotiate the applicable agreements and project scope. The authorization to construct and operate the pilot factory remains subject to additional DOE and INL agreements, reviews, authorizations, and other prerequisites before construction can start. As of September 30, 2026, we had not entered into any material binding commitments for its construction. We plan to design the pilot factory as a multipurpose fuel manufacturing and R&D platform, rather than a facility dedicated solely to a single fuel research project, and it will have a dedicated research and development laboratory. The pilot factory will operate under an NQA-1 nuclear quality assurance program from the outset.
I also want to be clear that DOE authorization of the pilot factory does not constitute authorization for lead test assemblies to be used in commercial power reactors. Any such use would remain subject to U.S. Nuclear Regulatory Commission licensing, review, and approval of lead test assemblies, as well as any required approvals by the host utility. The pilot facility will only ever be DOE-authorized and not subject to NRC licensing. Development of the pilot factory and our planned fabrication of lead test assemblies will require qualified sources of uranium feedstock, including high-assay low-enriched uranium and uranium metal. We are evaluating potential supply sources, alternative supply arrangements, and related infrastructure requirements to support these activities. Separately, we continue to build our organization at Lightbridge.
Idaho Falls is now home to more Lightbridge employees than any other location, and we expect to hire additional engineering and technical personnel as the Pilot Factory and our fuel development work progress. Our approach remains disciplined and aligned with program needs so that we attract top talent and build a world-class team while maintaining capital efficiency. With that, I'll turn the call over to Scott.
Thank you, Andrey. I will start with the Advanced Test Reactor loop, which is the milestone Seth mentioned. in August, we entered into Project Task Statement Number 2 under our Cooperative Research and Development Agreement with Battelle Energy Alliance, the DOE operating contractor for Idaho National Laboratory, which we announced in September. It gives us access to the loop testing facility of the ATR. Unlike other in-core positions, a loop irradiates fuel within its own independently controlled environment, the coolant chemistry, temperature, pressure, and flow a fuel rod would experience in a commercial light water reactor. There are a limited number of positions in the world where that is possible, and we're now able to place our fuel into one of them. Under this task statement, we will test enriched uranium-zirconium fuel rodlets with cladding in both cylindrical and multi-lobe geometry.
The scope of work includes experiment design, provision of materials, assembly, irradiation and shipment, and disposition of materials. Samples from this irradiation are later intended for further testing under transient conditions in INL's Transient Reactor Test Facility. The rodlets for that test build on our fabrication work with INL under SPP Project Task Statement Number 6, which supports the development of co-extruded fuel rod components for future loop irradiation testing in the ATR and transient testing. That program begins with depleted uranium, and upon successful demonstration, is expected to move to enriched uranium to produce fuel rod segments for irradiation experiments. Turning to the first batch of fuel material samples removed from the ATR in May, post-irradiation examination has begun.
That examination will collect data on fundamental material properties at various burnup levels, which is what is required to validate and verify our fuel performance models, and it becomes part of the basis of our licensing work.
Back to you, Seth. Thank you, Scott.
FULL TRANSCRIPT
Continue the full translated transcript in StockNow.
Log in to unlock every statement, the English original, and speaker-by-speaker history.
Log in for the full transcriptCall participants
7 people spoke on this call — only 2 are shown here.
PARTICIPANT LIST
View participant details in StockNow.
Log in to see executives and analysts, their roles, and complete speaking history.
Log in to view all participantsKeep exploring