Integra ResourcesITRG
Recorded

Integra Resources 2026 Q3 Earnings Call

Review the key takeaways and the transcript of this earnings call.

PeriodQ3 2026Duration29 minParticipants7

Transcript

Preview the first fifteen paragraphs, organized by speaker.

Operator

Good morning. My name is Chrislyn, and I will be your conference operator today. At this time, I would like to welcome everyone to Integra Resources Q3 2026 results conference call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. If you would like to ask a question during this time, press star followed by the number 1 on your telephone keypad. If you would like to withdraw your question, press star one again. Thank you. I would like to turn the meeting over to Josh Serfass, Vice President of Investor Relations. Josh, please go ahead. Thank you, Q4.

Josh SerfassVP of Investor Relations

I would like to welcome everyone to Integra's 2026 third quarter operating and financial results conference call. Before we begin, I would like to note that we will be making forward-looking statements during today's call. I will direct you to the second slide of the earnings presentation, which contains important cautionary notes regarding these forward-looking statements. The cautionary notes can also be found on Integra's corporate website. Please note, all dollar amounts discussed today will refer to the USD unless otherwise indicated. On the call today, I am joined by Integra's President, CEO, and Director, George Salamis, Chief Operating Officer, Cliff LaFleur, Chief Financial Officer, Andrée St-Germain, Vice President Finance, Sean Deissner, and General Manager of the Florida Canyon Mine, Greg Robinson. Today, we are pleased to provide an operating and financial update for the third quarter of 2026, followed by a live question and answer session.

Josh SerfassVP of Investor Relations

With that, I would like to hand the call over to George to kick things off.

George SalamisPresident, CEO, and Director

Thanks, Josh. Good morning, everyone, and thank you for joining us today to discuss Integra's third quarter 2026 results. The third quarter marked another period of strong progress for Integra, with continued production growth at Florida Canyon, supported by sustained high mining and stacking rates. This improving operational performance, combined with our strengthened financial position, is providing the foundation to execute on our broader strategy to become a multi-asset, U.S.-focused gold producer. When we acquired Florida Canyon in 2024, our objective was to establish a producing asset that could support Integra's next phase of growth. Over the past two years, we have gained a much deeper understanding of the operation, made targeted investments, and developed a mine plan that is expected to deliver higher production, lower cost, and stronger cash flow in the years ahead.

George SalamisPresident, CEO, and Director

At the same time, we continue to advance our DeLamar project in Idaho toward a future construction decision while unlocking additional value at our Nevada North project. Together, these projects provide a strong pipeline of growth opportunities that complement our producing asset at Florida Canyon. As we look ahead, our priorities are clear: continue improving operation performance at Florida Canyon, advance our development projects, and maintain a disciplined approach to capital allocation. We believe the progress made this year has positioned Integra for an important next phase of growth as we work towards becoming a mid-tier U.S. precious metal producer. The company ended Q3 in a strong financial position with $119.5 million in cash and working capital of $159.5 million.

George SalamisPresident, CEO, and Director

This financial strength positions Integra to execute on its growth strategy at Florida Canyon, advance DeLamar towards an anticipated permit in the second half of 2027, and progress permitting and data collection at Nevada North to support advanced economic studies. Operationally, Florida Canyon has posted its second consecutive quarter of production growth, producing 17,652 ounces of gold in the quarter, an 8% increase quarter-over-quarter, and a 40% increase over the first quarter of 2026. The company mined 97,428 total tons per day, which is a record for the mine, with processed grades increasing, decreasing throughout the year. Florida Canyon generated revenue of $72.4 million and operating cash flow of $21.8 million. The ore placed on the heap leach pad has increased 25% quarter-over-quarter as the company focuses on revised annual production guidance.

George SalamisPresident, CEO, and Director

With that, I will hand the call over to our COO, Cliff, to discuss the third quarter operating results for Florida Canyon.

Cliff LafleurCOO

Thanks, George. Turning to slide six, we've outlined the key operating metrics for Florida Canyon in the third quarter of 2026. The third quarter showed strong operating results for Florida Canyon with a record mining rate of 97,400 total tons mined per day. In Q3 2026, the company mined 5.3 million tons of ore and 3.6 million tons of waste at a strip ratio of 0.68 for the quarter. Average gold recovery was 52.5% for the quarter, which is down approximately 5%, reflecting the increased placement of run-of-mine ore on the heap leach pad versus crushed ore. Florida Canyon produced 17,652 ounces of gold in the quarter and sold 16,760 ounces, totaling 46,666 ounces of gold produced year to date. Q3 2026 mine site AISC was $3,059 per ounce sold, below our revised guidance, and cash costs averaged $2,419 per ounce sold.

Cliff LafleurCOO

Costs are impacted by elevated rates of mining, hauling, and stacking, as well as higher diesel, labor, and explosive costs. In the quarter, we invested $10.6 million in sustaining capital, focused on mobile equipment leases and refurbishments, as well as exploration drilling on resource growth. The company also continues to invest in a pre-stripping campaign at the Central Pit to access higher-grade ore, which will support the mine plan for the next few years. Ore from this area will ramp up through Q1 and Q2 of 2027. The company expects investments in sustaining capital expenditures to remain elevated in Q4 of 2026.

Cliff LafleurCOO

The company also invested $1.3 million in non-sustaining capital this quarter, primarily directed towards mobile fleet expansion and heap leach pad expansion to accommodate the longer mine life and increased production profile presented in the updated life-of-mine plan and technical report, which was filed in July of 2026. Exploration at Florida Canyon continues to deliver exciting results. I'll pass the call to George to discuss recent exploration results.

George SalamisPresident, CEO, and Director

Thanks, Cliff. Turning to exploration, prior to our acquisition of Florida Canyon in 2024, investment in exploration had not been a major focus. As we gained a deeper understanding of the operation, we began to identify a number of opportunities to grow the resource base, both within or immediately adjacent to existing mining areas and areas outside the mine gate. In addition, we also developed a new geological model for Florida Canyon, focused on improving our understanding of the geological controls on gold mineralization across the property. This work has helped us to refine our exploration strategy, identify new targets, and prioritize opportunities that could add meaningful ounces to the mine plan. Our recent drilling results are beginning to demonstrate the potential of this approach.

George SalamisPresident, CEO, and Director

One of the most promising areas is the Central Pit Radio Tower Saddle target, a 3.9 km by 2.9 km area located between two existing open pits. Recent drilling has delivered some of the strongest results since we've acquired Florida Canyon, including 1.3 grams per ton gold over 62.5 meters and 0.59 grams per ton gold over 167.6 meters. These results highlight the potential for meaningful resource growth within the existing mine footprint. As you can see in this cross-section, the Central Pit Radio Tower Pit Saddle area, mineralization is near surface with strong gold grade continuity throughout the drill hole. The grades encountered in the drilling are consistent with or exceeding those currently being mined at Florida Canyon. Furthermore, given its location between existing pits and close to established infrastructure, this area has the potential to support future mine plans and contribute additional gold ounces to the production profile.

George SalamisPresident, CEO, and Director

The company has planned an additional 54 drill holes, representing 5,400 meters at this target. Exploration drilling has also identified the Madre Shear North target, a new near-mine exploration opportunity located beneath the North Dump, whose material was included in the updated mine plan. The southern portion of the Madre Shear was mined by previous operators, but its northern extension remained largely unexplored due to limited access. Exploration drilling will also continue this year at the Standard Mine, a past-producing mine situated 8 km south of Florida Canyon, and the first target to be tested outside of the existing mine footprint by Integra. Now I will hand the call back to Cliff to discuss DeLamar updates.

Cliff LafleurCOO

Thank you, George. I'm now on slide nine. DeLamar continues to advance on multiple fronts as we prepare the project for a construction decision. Our focus has shifted from defining the project to preparing it for execution, with detailed engineering, procurement, permitting, infrastructure projects, and project financing activities all progressing in parallel. This work is designed to reduce execution risk and position DeLamar for a final investment decision following receipt of the Environmental Impact Statement and Record of Decision, which are expected in the second half of 2027. The public comment period of the National Environmental Policy Act ended in June 2026, and the Bureau of Land Management and its consultants have developed the issues statement that will drive analysis in the Environmental Impact Statement.

Cliff LafleurCOO

In addition, by the end of this year, Integra will have collected five years of baseline work at DeLamar, including thousands of surface and groundwater quality samples, air quality samples, and meteorological data. On engineering, Ausenco and SLR continue to make progress on critical infrastructure, including heap leach pad design, solution management systems, water treatment facilities, and electrical power infrastructure. In parallel, we are advancing procurement of long-lead equipment, including Merrill-Crowe processing plant, crushing facility, and electrical equipment, with principal orders expected to be placed by year's end. We have also made significant progress on site preparation infrastructure improvements. In July, we mobilized a crushing plant to DeLamar, which has processed approximately 39,000 tons of historical backfill material from privately owned land on both DeLamar and Florida Mountain to further validate the crushing circuit outlined in the feasibility study.

FULL TRANSCRIPT

Continue the full translated transcript in StockNow.

Log in to unlock every statement, the English original, and speaker-by-speaker history.

Log in for the full transcript

Other earnings calls that day

View calls from this day