Oklo 2026 Q3 Earnings Call
Review the key takeaways and the transcript of this earnings call.
- Oklo reported a year-to-date net loss through the 3rd quarter of 2026 of $123.3 million, including a loss from operations of $195.2 million, partially offset by $72.4 million of net interest and dividend income.
- Year-to-date cash used in operating activities was $110.9 million, cash used in investing activities was $1.3 billion, and capital spend was $280.9 million.
- At September 30th, Oklo had $3.1 billion of cash, cash equivalents, and marketable securities, including $1.5 billion of cash and cash equivalents and $1.6 billion of marketable securities; the balance reflected $2.3 billion raised through ATM offerings during the first 3 quarters of the year.
- Aurora, Idaho construction advanced from site and foundation preparation in September to vertical structural steel by November 4th; reactor area excavation is complete and safety-related rebar work is underway.
- DOE approved Oklo’s preliminary documented safety analysis for Aurora, Idaho, and A3F equipment installation is underway as Oklo prepares to fabricate the first core using secured EBR-2 material.
- Oklo has 900 megawatts under active consideration in PJM’s 2026 cluster study; PJM withdrew one application for a potential Virginia site, and FERC dismissed Oklo’s complaint, while the Ohio project and broader announced pipeline were not affected.
- Oklo signed an agreement with U.S. Forged Rings to provide capacity equivalent to 27 Aurora modules across 2030 through 2035 for components including vessels, lids, and support structures.
- Groves 1 reached first criticality less than a year after groundbreaking, after substantial construction was completed in 229 days; its build cost was approximately $65 million, plus approximately $10 million for commercially sourced fuel from Framatome.
- DOE selected Oklo for approximately $6.8 million to advance recycled metal fuel with Idaho National Laboratory, including manufacturing methods, fuel specimens, testing, and performance modeling.
- GROWS-2 was selected for DOE’s Nuclear Energy Launchpad, and Oklo said it has purchased and secured fuel from Promatome for the project.
STOCKNOW INSIGHTS
Continue with outlook and guidance.
Log in to unlock executive comments and Q&A highlights.
Log in for the full summaryStockNow uses AI to translate and summarize earnings calls. Accuracy and completeness are not guaranteed.
Transcript
Preview the first fifteen paragraphs, organized by speaker.
Hello, everyone. Thank you for joining us, and welcome to Oklo's third quarter 2026 financial results and webcast. After today's prepared remarks, we will host a question-and-answer session. If you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again. I will now hand the conference over to Sam Doane, Senior Director of Investor Relations.
Sam, please go ahead. Thank you, operator, and good morning, everyone.
Welcome to Oklo's third quarter 2026 earnings and company update call. I'm Sam Doane, Oklo's Senior Director of Investor Relations. Joining me today are Jake DeWitte, Oklo's Co-founder and Chief Executive Officer, and Craig Bealmear, our Chief Financial Officer. Earlier today, we released our third quarter 2026 financial results. Today's accompanying slide presentation is available on our investor relations section of our website. Before we begin, I'd like to remind everyone that today's discussion, including our prepared remarks and the question-and-answer session that follows, will include forward-looking statements. These statements reflect our current views regarding trends, assumptions, risks, uncertainties, and other factors that could cause actual results to differ materially from those discussed today. We encourage you to review the forward-looking statements disclaimer included in our accompanying presentation.
For a more complete discussion of these risks, please refer to our Form 10-Q for this quarter, our most recent Form 10-K, and our other filings with the Securities and Exchange Commission, which you can access via our investor relations website. Oklo undertakes no obligation to update any forward-looking statements as a result of new information, future events, or otherwise, except as required by law. With that, I'll turn the call over to Jake.
Jake? Thanks, Sam. Our ambition is to become one of the largest energy producers on Earth and beyond, and to make clean power, heat, and critical isotopes abundant and affordable.
We believe we have never been better positioned to deliver that vision. We are building Aurora-ID and its first core fuel fabrication capability. We've brought Groves-1 into operation. We are securing fuel, bringing critical manufacturing expertise in-house, and arranging capacity for future deployments. Our balance sheet allows us to commit capital behind that work. We are building for fleets, not just for one, and our ability to simultaneously build a number of smaller-scale projects as we build towards our larger-scale goals gives us meaningful chances to iterate repeatedly and learn from execution. Each project develops people, processes, supplier relationships, and operating experience that we retain and apply across Oklo. This sets us up to win. Fuel is foundational. Our strategy uses our balance sheet to connect sourcing, fabrication, and recycling to support our own deployments and serve other potential customers.
We are building reactors. We have built a reactor. We have fuel secured. We have operated a reactor, and we have the capital to keep going. That is where our confidence comes from. Government policies are creating additional pathways to put it to work. Three developments are particularly relevant to the business we are building. First, the NRC has finalized a rule that allows applicants to use relevant technical evidence from DOE-authorized reactor projects to support commercial licensing. For Oklo, that reinforces the strategic value of advancing Aurora-ID under DOE oversight. The safety analyses, testing, and operating experience we develop can support subsequent NRC applications where applicable, while meeting the NRC's requirements. That gives the work we are doing today greater value across future deployments.
We are building an operating reference and the technical foundation that can support a broader Aurora fleet. Second, Groves-2 Forge was selected for the National Reactor Innovation Center's Nuclear Energy Launch Pad. That provides access to DOE authorization pathways and specialized nuclear expertise as we advance our integrated isotope production and processing pilot. We have already taken Groves-1 through DOE authorization. Groves-2 gives us the opportunity to apply that experience while adding the processing and finishing capabilities needed to deliver isotope products. Third, DOE's Nuclear Lifecycle Innovation Campus initiative is solving for key difficulties in nuclear fuel infrastructure that could meaningfully impact our overall business plan. These campuses could connect fuel fabrication, enrichment, recycling, and waste disposition, potentially alongside reactors and power generation. That is closely aligned with our strategy. Scaling nuclear power requires investment across the fuel cycle, and we are developing capabilities to participate across several of those activities.
Together, these developments support the direction we have deliberately taken, building reactors, developing fuel infrastructure, and retaining the experience needed to deploy repeatedly. They are an important part of why we believe we have never been better positioned to execute our vision. The campus initiative could be a particularly important opportunity for our recycling business. The Nuclear Lifecycle Innovation Campus priorities closely match what Oklo already plans to build: recycling, fuel fabrication, power plants, and isotope production factories. Now, federal policy is enabling these. There is also a significant potential funding mechanism. The DOE reported more than $50 billion in the Nuclear Waste Fund at fiscal year-end 2025. Congressional action could make funding accessible for eligible nuclear waste management infrastructure within these campuses, including recycling, alongside private investment in commercial facilities.
That could expand opportunities to provide recycling services, fabricate fuel, access recycling feedstock, and sell recovered materials, serving utilities and other reactor operators while strengthening supply for our own fleet. Our Tennessee project is already part of the Oklo development plan, and additional campus opportunities depend on agreements, funding, and approvals. We are developing capabilities these campuses would need that give us a concrete foundation to pursue a broader commercial market. We are building Oklo to earn revenue across the nuclear lifecycle. Our reactors are designed to sell electricity and heat, with additional opportunities in radiation services. Fuel fabrication can serve both our fleet and external customers. Recycling can recover usable fuel and valuable isotopes while providing services to owners of used nuclear fuel. Our isotope business serves specialized markets, including healthcare and space. These activities reinforce each other.
Our powerhouses create fuel demand, fabrication and recycling support supply, engineering, procurement, asset delivery, and operating experience carry across the platform. We believe this integrated approach is allowing us to control our own destiny by giving us more security over critical deployment requirements and more ways to generate revenues as the nuclear energy industry scales. We are putting capital to work and assets on the ground. At Aurora-ID, construction is advancing into structural work. Alongside it, we are building A3F to fabricate the first core. We are advancing power projects, developing our Tennessee recycling facility, and preparing the Groves-2 Forge. At Groves-1, we have already completed the journey from a greenfield site to an operating reactor. That experience now sits inside Oklo. These projects are at different stages, but they demonstrate the breadth of what we are executing.
Reactors, fuel infrastructure, and isotope capabilities developed and informed together and by each other. We are investing with repeated deployment in mind. The teams, suppliers, manufacturing capabilities, asset delivery experience, and operating systems we establish today are intended to support many more assets. This is how we are building a business capable of delivering fleets. Let's turn to power, starting with the construction progress at Aurora-ID. These photographs show just over seven weeks of progress at Aurora-ID. In September, you see site and foundation preparation. By early October, administration building foundation work was advancing. By November 4th, structural steel was going up. This is our capital translating into physical infrastructure, with visible progress from one visit to the next. On a recent visit with a partner, what struck them was how much was happening on the ground and how quickly the site was changing.
These photographs give you a sense of what they saw. Here you can see the reactor building going vertical, excavation, the access tower, and rebar installation. Reactor area excavation is complete, and safety-related rebar work is underway, and vertical steel is being installed. Alongside construction, our teams are advancing procurement, engineering, and the fuel fabrication capability needed for startup. The pace is visible. The coordination behind it is equally important, getting design, suppliers, equipment, and field execution moving together. We are building our first Aurora powerhouse and developing the construction experience, supplier relationships, and project controls that will inform subsequent deployments. The work underway in Idaho is foundational to the fleet we intend to build. Bringing Aurora-ID into operation requires construction, equipment, authorization, and fuel to come together. We are advancing all four in parallel.
On construction, excavation at the site is complete, and structural and safety-related rebar work is underway. The next steps are continued reactor area construction and equipment installation. On procurement, component requests for proposals have been released and vendors selected. The focus now moves to fabrication, delivery, and integration. On authorization, DOE has approved our preliminary documented safety analysis, or PDSA. The PDSA approval for the Aurora-ID is an important milestone. It is comparable to an NRC construction permit in that it serves as a key regulatory review point for the project's preliminary design and safety analysis, supporting the advancement of safety-related construction and procurement while helping reduce the risk of significant safety-driven design changes later in development. The remaining authorization milestones include completion and approval of the documented safety analysis, readiness review, and startup authorization.
On fuel, we are developing A3F to fabricate and qualify our first core using our secured EBR-II material that we have already been allocated. We are managing these work streams together with specific execution milestones on the path to startup. We deliberately pursued interconnection applications across potential sites in PJM. Building a fleet requires developing several opportunities in parallel and managing the risks associated with each. Today, we have 900 MW under active consideration in PJM's 2026 cluster study. PJM withdrew one of our applications for a potential site in Virginia, and FERC ultimately dismissed our complaint challenging that withdrawal. That decision does not affect our Ohio project or our broader announced pipeline, and we are continuing to work constructively with PJM on those other interconnection applications.
FULL TRANSCRIPT
Continue the full translated transcript in StockNow.
Log in to unlock every statement, the English original, and speaker-by-speaker history.
Log in for the full transcriptCall participants
18 people spoke on this call — only 2 are shown here.
PARTICIPANT LIST
View participant details in StockNow.
Log in to see executives and analysts, their roles, and complete speaking history.
Log in to view all participantsKeep exploring